As per Rule A4.77, Pilbara ISOCo has completed consultation on the Interim Access and Connection Procedure.

The consultation process was as follows:

Event Date
Interim procedure published14 August 2023
Call for submissions11 September 2023
Public submission period11 September 2023 – 3 October 2023
Consideration of submissionsCompleted
Final procedure published29 December 2023

Documents related to this proposal:

Interim Access and Connection Procedure v2.0

Tracked changes – Interim Access and Connection Procedure

Interim Access and Connection Procedure v1.0

Submissions received:

Stakeholder Response Table

Alinta Energy

Horizon Power

Woodside Energy