As per Rule A4.77, Pilbara ISOCo has completed consultation on the Interim Power System Modelling Procedure.

The consultation process was as follows:

Event Date
Interim procedure published 2 October 2023
Call for submissions 2 October 2023
Public submission period 2 October 2023 – 10 November 2023
Consideration of submissions Completed
Final procedure published 22 December 2023

Documents related to this proposal:

Interim Power System Modelling Procedure v2.0

Tracked changes – Interim Power System Modelling Procedure

Interim Power System Modelling Procedure v1.0

Submissions received:

Stakeholder Response Table

APA

Horizon Power

Pacific Energy

Woodside Energy