As per Rule A4.77, Pilbara ISOCo has completed consultation on the Interim Protocol Framework Procedure.

The consultation process was as follows:

Event Date
Interim procedure published2 October 2023
Call for submissions2 October 2023
Public submission period2 October 2023 – 10 November 2023
Consideration of submissionsCompleted
Final procedure published28 December 2023

Documents related to this proposal:

Interim Protocol Framework Procedure v2.0

Tracked changes – Interim Protocol Framework Procedure v1.1

Interim Protocol Framework Procedure v1.1

Submissions received:

Stakeholder Response Table

APA

Horizon Power

Woodside Energy