The Rules require the Pilbara ISOCo to maintain and publish a high-level single line diagram of the North-West Interconnected System.  

The NWIS system map includes the:

  • the relative locations of all registered facilities
  • the transmission lines, who they are owned by and whether they are covered or non-covered networks
  • location of excluded networks and
  • the 66kV busbar within the Wedgefield sub-station is the reference node for the calculation of loss factors.

The Rules also require the Pilbara ISOCo to maintain and publish a list of certain covered elements: Network Elements List.

The system map, detailed inserts and definition tables can be downloaded as PDF files below: